Advance Concrete 2011 SP1 – Improved performance and stability


With Advance Concrete 2011 Service Pack 1, most functions’ speed was significantly increased compared to the 2010 version. Among these improvements: 

Advance Concrete 2011 - Start up speed   Start up speed  
The Startup speed is significantly improved. With SP1, AC starts ~3.5 times faster than AC 2010.
Advance Concrete - time to load an existing file decreased with SP1   Loading files  
The time to load an existing file decreased with SP1. Loading a file is 2 to 3 times faster than in AC2010 (the effect is even more visible with large files!).
Advance Concrete - Creating a new AC DWG file faster   Creating a new AC DWG file  
Creating a new empty AC DWG file is ~10 times faster than AC2010.
Advance Concrete - Faster reinforcement drawing creation   Creating reinforcement drawings  
The reinforcement drawing creation is ~3.5 times faster than in AC2010.
The performance test was performed with several basic structural elements with predefined reinforcement styles.
Advance Concrete - Faster reinforcement list update   Reinforcement list update  
The reinforcement list update speed is ~3 times faster than in AC2010.
Advance Concrete - Export drawings and layouts to DWG   Export drawings and layouts to DWG  
Export up to 20 types of views and layouts ~1.5 times faster than in AC2010.
Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s