This year, we are delighted to announce that GRAITEC has made the finals of the Construction Computing Awards in the following categories:
–> Construction Computing “One to Watch” Company 2012 (companies that are going to make a real impact in the industry) – GRAITEC UK;
–> Construction Computing “One to Watch” Product 2012 (new products in 2012 that are going to become “big” in the next 12 months) – GRAITEC ADVANCE Steel 2012 – Standalone;
–> Structural Design Product of the Year (accurate design of overall products and individual joints, whether working in steel, concrete or other materials) – GRAITEC UK – SuperSTRESS;
–> Product of the Year (the product which has impressed you most throughout 2012) – GRAITEC UK – ADVANCE Steel;.
–> Company of the Year (the company which has impressed you most throughout 2012) – GRAITEC UK.
Featuring more than 20 different categories, the Construction Computing Awards reward the technology, tools and solutions for design, construction, maintenance and modification of commercial buildings, residential and social housing and civil engineering projects of all types and sizes.
Voting started on September 13th, 2012, and will close on November 8th, 2012. You may cast your votes by registering your personal detailsand selecting your favorites here.
The Winners Ceremony will take place at Hotel Russell in London, on November 22nd, 2012.
Stay tuned for more information and don’t forget to show your support for our company and products.












The project consists of the three buildings which make up the centre – the remodeled Victorian vicarage, the classroom block, made of a steel/concrete hybrid design, with a very complicated roof and the Wessex Auditorium, an assembly hall with a complex box section truss design.




The Centre Pompidou-Metz is a large hexagon structured round a central spire reaching 77 meters high, with three rectangular galleries weaving through the building at different levels. The great nave covers 1,200 m² and provides flexibility for the exhibition of large artworks, with the ceiling rising progressively from a height of 5.70 to 18 meters.













The second 2011 DEVELOPMENT AWARD was received by Cosmin BARBU (
March 22nd, 2012.




Discover the implementation of Eurocodes in
From the Architect 2D drawing to the 3D modeling with
Efficient tools for stairs and railings with
Following an increasing interest from the Turkish market, on 9th of November 2011, starting at 10.30 EEST, a Live Demo for 


