Another winning performance at the Allianz Arena!


Congratulations Chelsea!

The magnificent Allianz Arena, opened in 2005, is home to both major Munich clubs, Bayern and TSV 1860. GRAITEC’ software was used in the design of the arena.

Allianz Arena Munchen

After a construction period of 951 days, the modern Allianz Arena was officially opened to the public.

This was a challenging construction, and another demonstration that GRAITEC continues to provide cutting edge software solutions that allow our customers to be efficient and competitive in the market.

Some facts on the Allianz Arena:

  • The Allianz Arena opened in 2005
  • Graitec software was used in the design
  • A total of 66,000 seats
  • A total base of 120m x 83m
  • A roof area of 38,000m²
  • A facade of 26,000m²
  • 120,000m³ of concrete
  • 22,000 tonnes of Steel

Other stadium projects completed using Graitec’s Advance Steel: 

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s