Advance Steel Project: Pedestrian foot bridge


Pedestrian foot bridge of University Campus at Brno Bohunice

Pedestrian foot bridge of University Campus at Brno Bohunice

Software used: Advance Steel
Project location: Brno, Czech Republic

Design Office: OKF s.r.o.
Architecture Office: A PLUS BRNO a.s.
Contracting Authority: MU Brno + AIG/LINCOLN

Project description:
The footbridge serves as a connection between Masaryk University in Brno, University Campus Bohunice (UCB) and the BRNO CAMPUS SQUARE (BCS) shopping center. The main support beam consists of orthotropic steel deck plates with integrated drainage troughs. Four sloped beams made from welded tapered rectangular cross sections are fixed into the reinforced head of every pillar. The cladding of the footbridge is made from bended composite sheets called BOND, or from fiberglass in the part above the trolley wire.

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s